Mission Overview
UPIP-SAT constellation and ground operations status
Active Satellites
12
4 LEO, 6 MEO, 2 GEO
Uplink
98.7%
Signal nominal
Next Launch
T-14d
Feb 21 08:45 UTC
Ground Stations
7
All operational
Power Systems
Solar Output4,250 W
Battery94.2%
Consumption3,180 W
Surplus+1,070 W
Thermal
Sun panels+82°C
Shadow panels-65°C
Internal21.4°C
CoolantNormal
Communications
Downlink150 Mbps
Uplink50 Mbps
SNR24.7 dB
Next pass12 min
Propulsion
Fuel67.3%
Delta-V142 m/s
Last burn3d ago
Next correctionFeb 12
Recent Events
| Time | Event | System | Status |
|---|---|---|---|
| 07:42 | Orbital correction complete | Propulsion | Nominal |
| 06:18 | Data downlink to Svalbard | Comms | Nominal |
| 05:55 | Thermal spike panel B4 | Thermal | Resolved |
| 04:12 | Battery charge complete | Power | Nominal |
| 02:30 | Debris avoidance prep | Navigation | Scheduled |
Live Telemetry
Real-time sensor data from UPIP-SAT Alpha
Altitude
550.12 km
Velocity
7.66 km/s
Period
95.6 min
Attitude & Navigation
Orientation
Roll0.12°
Pitch-0.05°
Yaw0.34°
Position (ECI)
X4,231.7 km
Y-2,847.3 km
Z3,912.1 km
Keplerian
Ecc0.00124
Inc51.6°
RAAN247.3°
Reaction Wheels
X-axis+2,450 RPM
Y-axis-1,820 RPM
Z-axis+3,100 RPM
SpareStandby
Star Trackers
Tracker A47 stars
Tracker B52 stars
Accuracy0.003°
Quat error1.2e-5
Orbital Tracking
Live constellation visualization
| Satellite | Orbit | Alt | Inc | Status | Health |
|---|---|---|---|---|---|
| UPIP-SAT A1 | LEO | 550 km | 51.6° | Active | 98% |
| UPIP-SAT A2 | LEO | 550 km | 51.6° | Active | 97% |
| UPIP-SAT A3 | LEO | 548 km | 51.6° | Active | 99% |
| UPIP-SAT A4 | LEO | 551 km | 51.6° | Maint | 85% |
| UPIP-SAT M1 | MEO | 8,200 km | 55.0° | Active | 96% |
| UPIP-SAT G1 | GEO | 35,786 km | 0.1° | Active | 92% |
Fleet Management
Aircraft and vehicle tracking
| Tail # | Type | Route | Alt | Speed | ETA | Status |
|---|---|---|---|---|---|---|
| N-UP001 | 737-800 | LAX-JFK | FL370 | 487 kt | 14:22 | Enroute |
| N-UP002 | A320neo | ORD-MIA | FL350 | 462 kt | 13:45 | Enroute |
| N-UP003 | 787-9 | SFO-NRT | FL410 | 512 kt | 06:30+1 | Enroute |
| N-UP005 | 737-800 | ATL | Gate | - | - | Board |
| N-UP006 | A330 | DEN | Hgr 3 | - | - | Maint |
Maintenance Tracking
Scheduled and predictive maintenance
N-UP001 - A-Check12 days
N-UP006 - Engine overhaulIn Progress
SAT A4 - Solar degradationMonitor
Supply Chain
Parts procurement pipeline
Reaction wheel assembly (x4)
Honeywell | Delivered Feb 1 | QC Passed
Star tracker module (x2)
Ball Aerospace | In transit | ETA Feb 10
Solar panel array (x8)
SolAero | Manufacturing | ETA Mar 1
Thruster nozzles (x12)
Aerojet Rocketdyne | PO Approved | ETA Apr 15
Rad-hard processors (x6)
BAE Systems | Awaiting quote | 16 wk lead