Architecture & BIM Simulator Interactive

Project Dashboard

Meridian Tower -- 12-story mixed-use development, 247K sqft, steel frame with curtain wall
Active Projects
5
2 in design, 3 under construction
Total Area
247K
sqft gross floor area
Total Budget
$48M
$4.2M under contingency
Completion
67%
Est. completion Nov 2026

Meridian Tower Primary

12-story mixed-use | Steel moment frame | Curtain wall facade | 185K sqft
Structure at Level 867%

Parkview Residences On Track

4-story residential | Wood frame over concrete podium | 32K sqft
Interior finishes underway89%

Harbor Medical Office Design Phase

3-story medical | Concrete tilt-up | 18K sqft | ADA-compliant throughout
DD phase - MEP coordination35%

Cedar Elementary Renovation Delayed

Seismic retrofit + addition | 8K sqft new, 12K renovated
Permit resubmittal required -- AHJ comments22%

BIM Model Viewer

Meridian Tower -- IFC model with structural, MEP, and architectural layers

Component Layers

Structural (W14x90 columns, W24x68 beams)ON
MEP (HVAC ducts, plumbing risers, conduit)ON
Architectural (curtain wall, partitions)ON

Clash Detection -- 7 issues found

HARDHVAC main duct intersects W24x68 beam at L2 grid B-3
HARDFire sprinkler branch conflicts with electrical conduit at L1 corridor
HARDPlumbing riser penetrates shear wall at L3 -- requires ASI
SOFTDuctwork clearance below code minimum (6'-8") at L2 lobby
SOFTCable tray routing conflicts with ceiling grid at L4 office
SOFTDoor swing arc overlaps ADA clearance zone at L1 restroom
SOFTRecessed light location interferes with structural deck flute

Project Timeline

Meridian Tower -- 24-month schedule, CSI MasterFormat phasing
Schematic Design
100%
Design Dev.
100%
Const. Docs
100%
Permitting
85%
Excavation
100%
Foundation
100%
Structure
65%
Envelope
40%
MEP Rough-In
30%
Interior Build
Not started
Finishes
Not started
Landscape
Not started
Punch / CO
Not started
Critical Path: Steel erection (L8-L12) → Curtain wall installation → MEP overhead rough-in → Elevator installation → Final inspections. Current float: 12 working days. Curtain wall lead time (14 weeks) is the primary schedule risk -- fabrication PO issued, shop drawings approved.

Milestone Tracker

Foundation complete -- Oct 2025
Structural steel to L4 -- Dec 2025
Structural top-out -- Mar 2026 (est.)
Building envelope complete -- Jun 2026
MEP trim-out -- Aug 2026
Certificate of Occupancy -- Nov 2026

Material Estimation

Bill of materials for Meridian Tower -- edit quantities to recalculate
MaterialSpecQtyUnitUnit CostTotal
Grand Total--

Cost Breakdown

Client Presentation

Meridian Tower -- Prepared for Meridian Development Group, LLC
South elevation -- curtain wall
Exterior Render -- South Elevation
Lobby interior -- 24ft ceiling
Interior -- Main Lobby
Roof terrace -- skyline views
Amenity -- Rooftop Terrace
Typical office floor plan
Plan -- Typical Floor (L5-L10)

Project Specifications

Gross Floor Area
247,000 sqft
Building Height
168 ft (12 stories)
Structural System
Steel moment frame
Facade
Unitized curtain wall
Parking
2 below-grade levels
Sustainability
LEED Gold target

Budget Status

Contract Amount$48,000,000
Approved Changes+$1,240,000
Billed to Date$32,160,000
Remaining$17,080,000

Change Orders

CO-001 Upgraded lobby finishes -- Italian marble
+$420,000 | Submitted Jan 15
Approved
CO-002 Additional electrical capacity for tenant L8
+$185,000 | Submitted Jan 28
Approved
CO-003 Rooftop terrace expansion + green roof
+$635,000 | Submitted Feb 3
Pending
CO-004 Reduce parking L2 scope (market demand)
-$310,000 | Submitted Feb 5
Pending
UPIP Architecture + BIM
$79/mo
vs
Autodesk AEC Collection $2,049/mo
Save $23,640/year per seat
67%
Overall Completion
12d
Schedule Float Remaining
7
BIM Clashes to Resolve

Recent Activity

RFI-047 response from structural engineer -- beam reinforcement at grid C-5 approved
2 hours ago
Curtain wall shop drawings Rev C uploaded to BIM 360 equivalent
5 hours ago
L8 concrete deck pour inspection passed -- 4500 psi verified
Yesterday
HVAC duct clash at L2 resolved -- rerouted below beam flange
Yesterday
CO-003 rooftop terrace expansion submitted to owner for review
2 days ago
Fire alarm riser diagram updated per AHJ comments
3 days ago

Deliverables Due

L9-L12 structural steel shop drawings -- Feb 12
4 days
Electrical panel schedule revisions -- Feb 15
7 days
Updated energy model (ASHRAE 90.1) -- Feb 20
12 days
Fire protection submittal package -- Feb 22
14 days