Mine Operations
Real-time production monitoring across 4 active extraction zones
Daily Tonnage
0
+0% vs target
Gold Grade (g/t)
0.00
Reserve avg: 2.8 g/t
Copper Grade (%)
0.00
Reserve avg: 0.42%
Shift Target
0 / 45,000t
0%
Active Pits & Shafts
00:00:00| Zone | Type | Status | Today (t) | Grade | Target | Progress |
|---|
Equipment Fleet
0 / 0 operationalHourly Production (Current Shift)
Geology & Exploration
Drill hole database, resource estimation, and block model visualization
Total Resource (Moz Au)
4.27
+0.3 Moz from infill drilling
Exploration Budget
$12.4M
$3.8M spent (31%)
Drill Metres (YTD)
14,820m
Target: 45,000m
Drill Hole Database
12 holes, 2026 campaign| Hole ID | Easting | Northing | Depth (m) | Au (g/t) | Cu (%) | Intercept |
|---|
Resource Estimation (JORC 2012)
Cut-off: 0.5 g/t Au eq.| Category | Tonnage (Mt) | Au (g/t) | Cu (%) | Au (Moz) | Cu (kt) |
|---|---|---|---|---|---|
| Measured | 24.6 | 3.12 | 0.48 | 2.47 | 118 |
| Indicated | 18.3 | 2.54 | 0.38 | 1.49 | 70 |
| Inferred | 5.8 | 1.87 | 0.31 | 0.35 | 18 |
| Total | 48.7 | 2.73 | 0.42 | 4.27 | 206 |
Block Model - Grade Distribution (Au g/t)
Level 340m RL | 10m x 10m blocks
W ← 100m → E
Hover for details
Au g/t
<0.5
0.5-1.5
1.5-3.0
3.0-5.0
>5.0
Processing Plant
CIL gold plant with copper flotation circuit - 4.5 Mtpa nameplate capacity
Mill Throughput
0 t/hr
0%
Gold Recovery
0%
Target: 92%
Copper Recovery
0%
Target: 88%
Gold Produced (oz)
0
Monthly target: 18,500 oz
Circuit Status
Reagent Consumption
Concentrate Production
Gold Dore (oz today)0
Copper Conc. (t today)0
Concentrate Grade28.4% Cu
YTD Gold Produced38,420 oz
Tailings & Water
Tailings Rate (t/hr)0
TSF Capacity Used67.3%
Water Recovery78%
Fresh Water Usage (ML/d)4.2
Safety & Environment
Zero harm target - continuous monitoring and compliance tracking
TRIFR
3.2
Industry avg: 5.7
LTI-Free Days
247
Record: 312 days
Open Hazard Reports
7
3 critical, 4 moderate
Permit Compliance
96%
22 of 23 compliant
Active Hazard Reports
7 OpenEnvironmental Monitoring
Live sensor dataRehabilitation Progress
Total disturbed: 482 haFinancial Performance
All-In Sustaining Cost analysis and commodity price tracking
AISC (per oz Au)
$0
Below guidance $1,180
Operating Margin
0%
Strong at current Au price
Mine Life Remaining
12.4 yr
Based on current reserves
NPV (8% discount)
$1.87B
IRR: 24.3%
Commodity Prices
Simulated live feedRevenue Waterfall (Monthly)
CAPEX Breakdown
$0MSustaining Capital$18.2M
Expansion Capital$42.6M
Exploration$12.4M
Equipment Replacement$8.7M
Total CAPEX$81.9M
OPEX Breakdown (per tonne)
Total: $45.20/tMining$18.40/t
Processing$14.60/t
G&A$5.80/t
Royalties$3.70/t
Haulage$2.70/t
Total OPEX$45.20/t
Project Economics
Net Present Value (NPV @ 8%)$1,872M
Internal Rate of Return (IRR)24.3%
Payback Period3.2 years
Gold Price Sensitivity (+/- $100/oz)NPV +/- $284M
Copper Price Sensitivity (+/- $0.50/lb)NPV +/- $167M
Break-Even Gold Price$1,247/oz